Seismic Retrofit of Clayton Middle School Gymnasium
Client:
Washoe County School District
Sq. Ft.:
8,900
Location:
Reno, NV
Sector:
Education
ServiceS:
Design-Build
Build Cost:
$1.5m
Timeline:
4 months
The Challenge
Archie Clayton Middle School, serving grades 6-8 in Reno, NV, required significant structural upgrades to bring its gymnasium up to modern seismic safety standards. With increasing concerns over earthquake resilience, the existing infrastructure needed reinforcement to ensure long-term safety for students and staff.
Key challenges included:
- Outdated Infrastructure: The gymnasium was not compliant with current seismic codes.
- Tight Timelines: All work had to be substantially completed in one summer to avoid disrupting the school year.
- Large Scope of Work: The project required full roof replacement, structural steel connections, and interior upgrades.
- Weather Challenges: Reno’s unpredictable climate posed additional scheduling risks.
The Strategy
Reyman Brothers Construction implemented a phased approach to tackle the project efficiently while minimizing disruptions.
Phase 1: Pre-Construction & Planning
- Revisited structural assesessment to determine the extent of necessary upgrades.
- Developed a preliminary schedule to keep the project on track.
- Procured specialized materials, including steel structural reinforcements and seismic bracing components.
Phase 2: Seismic Retrofit & Construction
- Full Roof Strip & Replacement: Removed outdated roofing and installed a new single-ply membrane.
- Structural Upgrades: Installed steel seismic connections to glue-laminated beams and framing members.
- Exterior Enhancements: Added rainscreens for improved weather resistance and modern aesthetics.
- HVAC, Electrical, & Lighting Upgrades: Provided the gym with modern energy efficiency and safety standards.
Phase 3: Final Inspections & Testing
- Conducted structural safety inspections to confirm compliance with Reno’s updated seismic codes.
- Coordinated with Washoe County School District reps to ensure all systems were functioning optimally.





The Solution
Reyman Brothers Construction successfully transformed the outdated Clayton Middle School Gymnasium into a seismically sound, modernized structure that will serve students for years to come.
- Improved structural integrity to withstand seismic activity in Northern Nevada.
- Enhanced existing utilities with new HVAC and electrical systems.
- Modernized aesthetics through exterior renovations and interior upgrades.
The Results
The gymnasium was substantially completed on time, providing a safer learning and recreational environment for students at Clayton Middle School.
Key Benefits:
- Reinforced seismic structure ensuring long-term safety.
- Upgraded HVAC, electrical, and lighting systems for recreational use.
- Opened doors for future interior remodels to enhance functionality.
Reyman Brothers Construction continues to be a trusted partner for school renovation and seismic retrofitting projects in Reno, NV, ensuring educational facilities meet the highest safety and structural standards.
Let’s Build Together
For more information on our history or to seek client references, please contact our team directly. Call (775) 356-0150 or email info@reymanbrothers.com. One of our representatives will get in touch with you as quickly as possible.