When Fire Station #1 needed to modernize critical spaces, the goal wasn’t cosmetic. It was operational.

As a commercial general contractor serving Sparks and Reno, Reyman Construction renovated the first-floor gear wash area and reconfigured third-floor living quarters—all while the station remained active.


The Challenge

First Floor – Equipment Wash Room

The existing space lacked the infrastructure needed for new heavy-duty gear-wash equipment. Proper pads, utility coordination, and durable finishes were needed to support long-term use.

Third Floor – Living Quarters

Dorm areas were underutilized. Storage and circulation space limited functionality. The station needed new restrooms and showers, including ADA-compliant accommodations, to better serve crews working 24-hour shifts.

Construction Obstacles

  • Elevated third-floor renovation
  • Continuous coordination within an operational fire station
  • Tight staging and mobilization conditions
  • Precise sequencing of demolition, plumbing, framing, and finishes

For organizations seeking a fire station renovation contractor in Sparks, NV, or a municipal construction company in Northern Nevada, these conditions distinguish planning from execution.


The Strategy

Reyman Construction approached the project with disciplined preconstruction and trade coordination.

Preconstruction Alignment

In-house debrief and owner coordination set expectations for phasing and logistics.

Trade Partner Coordination

Early subcontractor engagement ensured schedule buy-in and material procurement.

Execution Plan

  • Expedite demolition with limited interruption.
  • Advance plumbing rough-ins early
  • Maintain schedule momentum from framing to finishes.
  • Preserve operational readiness throughout construction.

This is how public facility renovations stay on track.


Scope of Work

First Floor

  • Removal and relocation of outdated wash infrastructure
  • Installation of new owner-furnished heavy-duty wash equipment
  • Structural pad preparation
  • Utility coordination and wall improvements

Third Floor

  • Demolition of storage restroom and circulation areas
  • Construction of three new restrooms, including one ADA-compliant unit
  • Designer-selected tile finishes
  • Tempered glass shower enclosures
  • Solid surface casework
  • Upgraded plumbing fixtures

Materials were selected for durability, hygiene performance, and longevity—critical in public safety facilities.


The Results

  • Modernized firefighter hygiene facilities
  • ADA-compliant restroom installation
  • Optimized use of existing building footprint
  • Upgraded infrastructure for long-term durability
  • Minimal disruption to daily emergency operations

For municipalities and agencies looking for a commercial renovation contractor in Sparks, Reno, or Washoe County, this project reflects Reyman Construction’s approach:

Built for service.
Built to perform.
Built to last.


If you are planning a municipal building renovation, fire station remodel, or public safety facility upgrade in Northern Nevada, Reyman Construction delivers craftsmanship grounded in execution.

Let’s Build Together

For more information on our history or to seek client references, please contact our team directly. Call (775) 356-0150 or email info@reymanbrothers.com. One of our representatives will get in touch with you as quickly as possible.

Build Request Form – Short