Reed High School Gym Renovation in Sparks, NV

Client:

Washoe County School District

Sq. Ft.:

12,640

Location:

Reno, NV

Sector:

Education

ServiceS:

Design-Build

Build Cost:

$1.6m

Timeline:

Completed in under 4 months

The CHALLENGE

As one of Sparks’ core high schools since 1974, Edward C. Reed High School faced aging infrastructure in its two primary gymnasiums. The spaces were outdated and deteriorating, failing to meet the standards required for a modern athletic environment. Washoe County School District needed a full renovation completed on a compressed timeline—under strict abatement regulations and within the building’s existing footprint. The project also required supporting growing athletic programs and accommodating large groups of spectators.

The Strategy

Reyman Brothers Construction developed a transparent and efficient project roadmap that focused on early coordination, material procurement, and speed-to-execution without compromising quality.

Key Project Steps:

  • Preconstruction & Debrief:
    Internal team kickoff, WCSD preconstruction meetings, and subcontractor scheduling.
  • Material Planning:
    Early ordering of sports flooring, bleacher systems, and underlayment.
  • Execution:
    • Abatement and demolition of two existing gym floors and bleachers
    • Installation of high-performance sports flooring and new bleacher packages
    • Interior finish upgrades, including paint and wall treatments

Project Goals

Short-Term:

  • Complete abatement with minimal disruption
  • Float concrete slab for proper flooring install
  • Acclimate and install new flooring in time for school opening

Long-Term:

  • Deliver two modern, high-performance gymnasiums
  • Align with WCSD’s long-term vision for quality student facilities

The Solution

Reyman Brothers transformed two worn-down gyms into vibrant, fully modernized athletic spaces that reignited school spirit and expanded student-athlete engagement—the result: a space that inspires participation and enhances the experience for both athletes and fans.


The Results

  • Optimized Use of Space: Stayed within the existing footprint, avoiding costly expansion
  • Improved Athletic Engagement: Renewed interest in sports and extracurriculars
  • Lasting Build Quality: High-grade materials selected for long-term durability
  • Enhanced Aesthetics: Clean finishes and modern design elements throughout

Let’s Build Together

For more information on our history or to seek client references, please contact our team directly. Call (775) 356-0150 or email info@reymanbrothers.com. One of our representatives will get in touch with you as quickly as possible.

Build Request Form – Short