Client Background Reno Tahoe International Airport (RTAA) stands as the second-largest commercial airport in Nevada, serving as a pivotal hub for both domestic and international travel. Challenge The challenge involved remodeling the RTAA Base Ops and Airfield Maintenance Office, including parking and site improvements, ADA restroom upgrades, extensive demolition, storefront and access enhancements, as well … Read more
Service: Design-Build
Client Background Western Nevada College, a public college with its main campus in Carson City, Nevada, embarked on a renovation project for the Marlette Lecture Hall. The college serves multiple locations and offers a diverse range of degree programs and certificates. Challenge The project focused on repurposing an existing terraced lecture hall, involving partial demolition … Read more
Reyman Construction and Les Schwab joined forces to bring Spanish Springs, NV, a much-needed tire center. This partnership aimed to provide the local community with an exceptional tire sales and service facility. Scope of Work Our team at Reyman Construction took on a comprehensive scope of work, ensuring every detail was meticulously addressed. This included … Read more
Scope Develop and furnish a 32,000 sq. ft. site, including the construction of a 16,000 sq. ft. concrete building with a 3,500 sq. ft. mezzanine. The project involved creating separate spaces for a millwork shop, a welding and fabrication shop, and an expansive storage area. Site work included 10,000 sq. ft. of AC paving, a … Read more
Get ready to dive into the story of the Temptec Manufacturing Plant project by Reyman Bros. Construction. This case study gives you a peek into how we turned Temptec’s vision into a real-life space. From Blueprint to Reality Imagine creating a manufacturing plant from the ground up. That’s what we did with Temptec. It’s not … Read more
The Eagle Picher 110 x 260 Warehouse Construction project in Lovelock, Nevada, highlights how Reyman Bros. Construction effectively amplified EP Minerals’ capabilities. Scope of Work We were tasked with creating a 27,000 sq ft warehouse to serve as a versatile dry lab. Our goal was to seamlessly expand EP Minerals’ existing setup. Challenges and Solutions … Read more